11/2024 - PRESENT

VELEBIT PUMPED-STORAGE HYDROPOWER PLANT

The project involves the reconstruction of facilities at the Velebit Pumped-Storage Hydropower Plant.

Scope of works performed: excavation works, embankments, construction of water supply and drainage systems, new operations building, reinforced concrete works on the external plateau, asphalt works.

11/2025 - PRESENT

VARTEKS COMPLEX, VARAŽDIN

The project includes construction of the “S-park” Retail Park with shops and catering facilities.

Scope of works performed: excavation works, embankments, asphalt preparation, asphalt works.

11/2025 - PRESENT

EUROSPIN RETAIL CENTER

The project includes demolition of the existing building and construction of a commercial building for retail and office purposes for the Eurospin retail center in Savska Opatovina.

Scope of works performed: demolition, excavation works, embankments.

07/2025 - PRESENT

VINKOVCI LOGISTICS AND DISTRIBUTION CENTER

The project includes construction and equipping of a new logistics and distribution center in Vinkovačko Novo Selo.

Scope of works performed: excavation works, embankments, construction of water supply and drainage systems, asphalt preparation, asphalt works.

06/2025 - PRESENT

FC HRVACE IRRIGATION SYSTEM

The project includes construction of an irrigation system for the FC Hrvace football pitch in the municipality of Hrvace.

Scope of works performed: excavation works, embankments, construction of water supply and drainage systems.

11/2024 - PRESENT

KINDERGARTEN, SVETI IVAN ZELINA

The project includes construction of a new regional kindergarten in Donja Zelina.

Scope of works performed: excavation works, embankments.

05/2025 - PRESENT

Residential and Commercial Building A11 in Podbrežje, Zagreb

The project includes construction of a new residential and commercial building A11 in Podbrežje, Zagreb.

Excavation of a construction pit with a volume of 52,000.00 m3.

Scope of works performed: excavation works, embankments.

11/2025 - PRESENT

CROATIAN HIGHWAYS

The project includes construction of a new electronic toll collection system on the Croatian highway network, aiming for free flow without vehicle stops.

Scope of works performed: excavation works, embankments, reinforced concrete works.

11/2024 - PRESENT

GLINA SUBSTATION

The project includes reconstruction of the 110 kV facility at the 110/20 kV Glina substation.

The project includes civil works for the construction of foundations and steel portal structures, construction of foundations and steel structures for equipment pedestals, construction of a new operations building, construction of new and rehabilitation of existing transport routes, construction of a new main cable trench, and plateau landscaping.

Scope of works performed: excavation works, embankments, construction of water supply and drainage systems, reinforced concrete works on the external plateau, asphalt preparation, asphalt works, operations building.

07/2025 - PRESENT

FERENŠČICA SUBSTATION

The project includes supplementation of the MV facility 4TS Ferenščica.

Scope of works performed: excavation works, embankments, reinforced concrete works on the external plateau and inside the operations building.

04/2025 - 10/2025

PRODUCTION AND OFFICE BUILDING FOR BRODOMETALURGIJA, PISAROVINA

The project includes construction of a new production and office building in Pisarovina, along with a plateau and infrastructure.

Scope of works performed: excavation works, embankments, construction of water supply and drainage systems, reinforced concrete works on the external plateau, asphalt works.

08/2025 - 10/2025

"Varteks" Complex, Varaždin

The project includes demolition of part of the buildings within the “Varaždin” textile industry factory complex.

The complex consists of 5 unconnected buildings, which are not in use, and comprise ground and above-ground floors with a total gross construction area of 42,149.30 m2.

Scope of works performed: demolition of buildings.

05/2025 - 10/2025

POREČ SUBSTATION

The project includes reconstruction of the substation and procurement and installation of 2×30 MVAr capacitor banks at the 110/20 kV Poreč substation.

Scope of works performed: excavation works, embankments, reinforced concrete works on the external plateau, asphalt works.

11/2024 - 10/2025

ORŠIĆ CASTLE, JAKOVLJE

The project includes comprehensive and energy-efficient renovation of Oršić Castle in Jakovlje, damaged in the 2020 earthquake.

Scope of works performed: excavation works, embankments.

12/2024 - 07/2025

ŠIJANA SUBSTATION

The project includes reconstruction of the substation and procurement and installation of 2×30 MVAr capacitor banks at the 110/35/10 kV Šijana substation.

Scope of works performed: excavation, embankments, reinforced concrete works on the external plateau, asphalt works.

04/2025 - 07/2025

KORLAT PHOTOVOLTAIC POWER PLANT

The project includes construction of the Korlat photovoltaic power plant with a capacity of 99MWp and infrastructure.

Scope of works performed: excavation works, embankments, construction of water supply and drainage systems, reinforced concrete works on the external plateau, asphalt works.

11/2024 - 07/2025

BUSINESS AND WAREHOUSE COMPLEX OF PERI FORMWORK AND SCAFFOLDING LTD.

The project includes construction of a new business and warehouse complex for PERI Formwork and Scaffolding.

Scope of works performed: excavation works, embankments, asphalt works.

11/2024 - 07/2025

ACCESS ROAD AND BRIDGE IN MIKULIĆI, ZAGREB

The project includes reconstruction of a section of Matuni Street with utility infrastructure and construction of a new bridge over Veliki Potok.

Scope of works performed: excavation works, embankments, construction of water supply and drainage systems, reinforced concrete works, asphalt works.

02/2025 - 06/2025

IKEA RETAIL PARK

The project includes construction of a new retail center “Retail Park”.

Scope of works performed: excavation works, embankments, asphalt preparation.

01/2025 - 05/2025

HORVATI ELEMENTARY SCHOOL

The project includes construction and equipping of an elementary school in Horvati, Zagreb.

Excavation of a construction pit with a volume of 13,000.00 m3.

Scope of works performed: excavation works, embankments.

06/2024 - 02/2025

INA OIL REFINERY, RIJEKA

The project includes modernization of the Rijeka refinery with the construction of a heavy residue processing plant and reconstruction of existing units, as well as a new port with a closed coke storage facility.

Scope of works performed: reinforced concrete works on the external plateau.

12/2024 - 02/2025

RESIDENTIAL BUILDING VELIKA GORICA

The project includes demolition of existing and construction of several individual residential buildings in Velika Gorica.

Scope of works performed: demolition, excavation works, embankments.

2023 - 2024

Zlatar Bistrica Agglomeration

The project includes construction of a public drainage system for the Zlatar Agglomeration in the municipality of Zlatar Bistrica.

The total length of channels designed in this project is 10,987.50 m

Scope of works performed: excavation works, embankments, construction of water supply and drainage systems

05/2022 - 12/2024

METKOVIĆ AGGLOMERATION

The project includes a major undertaking of construction and reconstruction of water supply and drainage systems in southern Dalmatia.

The total length of channels designed in this project is 16,905.00 m.

Scope of works performed: excavation works, embankments, construction of water supply and drainage systems, reinforced concrete works.

07/2024 - 12/2024

Galdovo Shipyard Dock, Sisak

The project includes reconstruction of the ship slipway and upstream riverbank reinforcement on the Sava River, with an associated plateau and infrastructure.

A reinforced concrete slab for the plateau and the flat part of the slipway was constructed, covering an area of 6,000.00 m2.

Scope of works performed: excavation works, embankments, reinforced concrete works, railway track system works.

11/2023 - 12/2024

GUŠĆE DRAINAGE SYSTEM

The project involves the construction of a water supply and drainage system for the settlement of Gušće within the Sisak-Moslavina County.

Scope of executed works: excavations works, embankments, construction of water supply and drainage systems, reinforced concrete works.

08/2024 - 10/2024

EXPLOITATION FIELD "CERJE TUŽNO"

The project involves excavation, loading, and transport of clay to the clay disposal site (spoil heap) at the “Cerje Tužno” exploitation field.

Scope of executed works: excavations works, haulage.

05/2024 - 09/2024

RESIDENTIAL BUILDING RIHTMANOVA – NOVA CESTA, ZAGREB

The project involves the construction of a new residential building in Zagreb.

Excavation of a construction pit with a volume of 17,000.00 m3.

Scope of executed works: excavations works, embankments.

12/2023 - 09/2024

PLOMIN SUBSTATION

The project involves the reconstruction of the DC and AC power supply subsystem for the 220/110 kV plant of the Plomin substation.

Scope of executed works: excavations works, embankments, reinforced concrete works on the external plateau.

04/2023 - 09/2024

RIVERBANK PROTECTION IN KARLOVAC

The project involves the construction of the Kupa River embankment, riverbank protection, and a protective wall on the left bank of the Kupa River from the settlement of Selce to the settlement of Rečica.

Scope of executed works: excavations works, embankments, reinforced concrete works.

07/2024 - 09/2024

KTE JERTOVEC

The project involves the reconstruction of the 110 kV plant at the 110/35 kV KTE substation Jertovec.

Scope of executed works: excavation works, embankments, reinforced concrete works on the external plateau, construction of water supply and drainage systems, operational building, asphalt works.

02/2023 - 07/2024

OXY GASES PLANT, VELIKA GORICA

The project involves the construction of a new air separation plant for the production of nitrogen, oxygen, and argon in Velika Gorica.

Scope of executed works: excavation works, embankments, construction of water supply and drainage systems, asphalt preparation.

04/2024 - 06/2024

RIJEKA ROAD IN THE CITY OF SENJ

The project involves works on the reconstruction of an unclassified road – Riječka Road in the city of Senj from the northern entrance of the Adriatic Highway to its southern exit.

Scope of executed works: excavation works, embankments, construction of water supply and drainage systems, reinforced concrete works, asphalt works.

09/2023 - 06/2024

MRACLIN SUBSTATION

The project involves the reconstruction of the 110 kV plant at the 220/110/10 kV Mraclin substation.

Scope of works performed: excavation works, embankments, asphalt works.

01/2024 - 05/2024

DONJA STUBICA - JEZERČICA BRIDGE

The project involves the construction of an access road next to Jezerčica with the construction of a new bridge over the Topličina stream on local road 22106 in Donja Stubica.

Scope of works performed: excavation works, embankments, construction of water supply and drainage systems, reinforced concrete works, asphalt works.

04/2024 - 05/2024

NOISE BARRIER IN BRTONIGLA MUNICIPALITY

The project involves the construction of a noise barrier between Nova Vas and Buje, 230.00 m in length, in Brtonigla municipality.

Scope of executed works: excavations works, embankments, reinforced concrete works.

09/2023 - 12/2023

KRAPINSKE TOPLICE LANDSLIDE

The project involves works on the remediation of a landslide covering an area of approximately 6,000.00 m2, located directly above the Krapinske Toplice Special Hospital for Medical Rehabilitation.

Scope of executed works: excavations works, embankments, construction of water supply and drainage systems, reinforced concrete works.

02/2023 - 07/2023

GORNJA REKA BRIDGE

The project involves remediation works on the Gornja Reka bridge on local road LC 31138 at km 4+389.

Scope of executed works: excavations works, embankments, reinforced concrete works, asphalt works.

03/2023 - 06/2023

GUSAKOVEC LANDSLIDE

The project involves remediation works on a landslide in Gornja Stubica municipality on unclassified road NC-1-012 in the settlement of Gusakovec.

Scope of works performed: excavation works, embankments, construction of water supply and drainage systems, reinforced concrete works, asphalt works.

03/2023 - 06/2023

JAKŠINEC LANDSLIDE

The project involves works on the remediation of a landslide in Gornja Stubica municipality on unclassified road NC-1-042 in the settlement of Jakšinec.

Scope of works performed: excavation works, embankments, construction of water supply and drainage systems, reinforced concrete works, asphalt works.

05/2023 - 08/2023

GORNJI DESINEC BRIDGE

The project involves works on the remediation of the bridge Gornji Desinec on county road ŽC 3105 at km 2+845.

Scope of executed works: excavation works, embankments, reinforced concrete works, asphalt works.

01/2022 - 12/2022

ZAPREŠIĆ AGGLOMERATION

The project involves the construction, reconstruction, and remediation of the sewage network and the reconstruction of the water supply network of the Zaprešić agglomeration.

Scope of works performed: excavation works, embankments, construction of water supply and drainage systems.