The project includes reconstruction of the 110 kV facility at the 110/20 kV Glina substation.
The project includes civil works for the construction of foundations and steel portal structures, construction of foundations and steel structures for equipment pedestals, construction of a new operations building, construction of new and rehabilitation of existing transport routes, construction of a new main cable trench, and plateau landscaping.
Scope of works performed: excavation works, embankments, construction of water supply and drainage systems, reinforced concrete works on the external plateau, asphalt preparation, asphalt works, operations building.